Identifying a Reference Peak

To set up a reference peak for either Time-based or Peak-based heart-cutting,

  1. In the Function column, select Start Peak-based.

  2. Click in the Parameter cell to displayb the parameters

  3. Select a Reference Index and Expected Time for the reference peak.

The reference peak is available for both Peak-based and Time-based heart-cutting.