Use the Copy or Increment option to copy or increase the value (one by one) of an analysis parameter to a selection of analyses contained in the analysis or sequence table.
Whether a value can be incremented or copied is parameter-specific. For example, you cannot increment the value of an instrument, a project, or a LIMS connection.
Preparations
|
Select both the analysis with the currently defined parameter value, and the analysis or analyses to which this value is to be copied or increased.
In the analysis with the currently defined parameter value, right-click the parameter and select Copy on column <parameter> or Increment on column <parameter>.
The value of the first selected analysis is copied or incremented on the other analyses.
In the context menu,
click
Copy or
Increment.
The value of the first selected analysis (sequence line) is copied/incremented on the other analyses (sequence lines).
base-id: 11194390923
id: 11194390923-1