The Plumbing section of the Column Assignment dialog box contains a table where you can specify the plumbing assignment for each valve position.
The table has four columns:
Path |
The number of the path; the number of available paths depends on the topology of the Valve Thermostat Cluster. |
Usage |
The usage of the path. This can be a column, a connection to Waste, a connection to Bypass, or None. Click the down-arrow and select the usage from the drop-down list. |
Column Host |
The column device to which the path is connected. The available column devices depend on the configuration of the Valve Thermostat Cluster. Click the down-arrow and select the column device from the drop-down list. |
Location |
The location of the column in the column host. Columns can be either half-length or full-length (full-length columns take up two positions). Click the down-arrow and select the location from the drop-down list. Depending on the configured column hosts, you can choose from: Left 1 .. Left n (left side positions for half-length columns) Right 1 .. Right n (right side positions for half-length columns) Full 1 .. n (full-length columns occupying both sides) Upper (G7130A Integrated Column Compartment only) Lower (G7130A Integrated Column Compartment only) Waste Bypass None (no connection, or connection to an external column) |
When you select a line in the table, the corresponding line is highlighted in the Column Tag Information table.
base-id: 3397243915
id: 3397243915