To set up a reference peak for either Time-based or Peak-based heart-cutting:
In the Function column, select Start Peak-based.
Click in the Parameter cell to display the parameters.
Select a Reference Index and Expected Time for the reference peak.
base-id: 3449111435
id: 3449111435